DEVELOPERS & NEW CONSTRUCTION

Plan Technology Before Construction Defines the Limits.

ALTRIOM TECH works with developers, architects, designers, contractors, and project teams to coordinate technology infrastructure from concept through commissioning across Miami, Cancรบn and Riviera Maya.

PROJECT CONTROL POINTS

Plans approved before pathways are closed

Rough-in verified before finishes

Equipment coordinated before trim-out

Systems commissioned before handoff

CONCEPT

DESIGN

ROUGH-IN

TRIM & EQUIPMENT

COMMISSIONING

HANDOFF

EARLY COORDINATION

Technology Is Part of the Building Plan.

Low-voltage pathways, device locations, equipment rooms, ceilings, doors, gates, cabinetry, exterior spaces, power, ventilation, finishes, and service access all affect the final technology result.

Planning those interfaces early gives the project team more options and reduces avoidable rework after construction decisions become difficult to change.

Without Planning

Missing pathways, visible compromises, congested racks, inaccessible equipment, late penetrations, changed finishes, and unclear ownership.

With Coordination

Defined routes, approved locations, clear responsibilities, coordinated interfaces, inspection points, testing milestones, and documented handoff.

CONSTRUCTION ROADMAP

Technology Milestones Aligned with the Build

PHASE 01

Concept & Scope

Review property type, users, business goals, technology expectations, project schedule, systems, budgets, responsibilities, and future phases.

PHASE 02

Design Coordination

Define pathways, equipment rooms, racks, outlets, device locations, ceiling and millwork interfaces, outdoor areas, power, ventilation, doors, gates, and controls.

PHASE 03

Rough-In & Verification

Install pathways, copper, fiber, low-voltage boxes, supports, backboards, panels, labels, and service loops; verify before walls and ceilings close.

PHASE 04

Trim & Equipment

Terminate, label, mount, install racks and devices, protect finishes, coordinate final locations, and document approved field conditions.

PHASE 05

Configuration & Testing

Configure networks and systems, program selected integrations, test cabling and operation, optimize, correct deficiencies, and prepare handoff.

PHASE 06

Handoff & Support

Deliver approved records, orient authorized users, clarify responsibilities, close exceptions, and establish a path for support and future changes.

COORDINATED SYSTEM SCOPE

One Infrastructure Plan for Every Connected System

Cabling & Fiber

Pathways, copper, fiber, backboards, racks, terminations, outlets, labels, testing, and future provisions.

Networks & WiFi

Internet handoff, switching, routing, access points, segmentation, coverage, device networks, and equipment rooms.

Security & Access

CCTV, intrusion protection, doors, gates, intercoms, selected credentials, service access, and monitoring interfaces.


Automation & Lighting

Control locations, keypads, touchscreens, panels, climate interfaces, shades, scenes, pool-related systems, and supported integration.

Audio & Video

Speakers, displays, theaters, meeting rooms, distribution, control, outdoor zones, cabinetry, ventilation, and acoustic considerations.

IT & Operations

Workstations, communications, support systems, equipment organization, documentation, maintenance access, and future upgrades.

ENGAGEMENT LEVELS

Bring ALTRIOM TECH into the Project at the Right Level

DESIGN ONLY

Technology Planning

Scope development, technology coordination, pathways, rooms, device locations, system categories, trade interfaces, milestone reviews, and planning documentation.

DESIGN + PREWIRE

Infrastructure Delivery

Planning plus pathways, structured cabling, fiber, panels, racks, terminations, labels, rough-in verification, testing according to scope, and infrastructure records.

COMPLETE DELIVERY

Turnkey Integration

Planning and infrastructure through equipment installation, configuration, selected programming, integration, testing, documentation, user orientation, and support planning.

Deliverables, responsibilities, review stages, testing, documentation, equipment, and integration scope are defined for each project before execution.

TRADE COORDINATION

Resolve Interfaces Before They Become Field Conflicts.

Technology touches more trades than most teams expect. Clear coordination helps preserve architecture, schedule, equipment access, finish quality, and system performance.

Architecture & Interiors

Ceilings, walls, millwork, finishes, displays, speakers, controls, equipment access, and visible-device alignment.

Electrical & Mechanical

Power, grounding coordination, lighting panels, equipment loads, ventilation, climate interfaces, and separation requirements.


Doors, Gates & Security

Lock hardware, contacts, request-to-exit, intercom, access devices, gate controls, conduits, power, and operational sequences.

Site & Landscape

Exterior pathways, cameras, WiFi, audio, gates, pools, gardens, lighting interfaces, weather exposure, and service access.

What a Clear Handoff Can Include

  • Approved scope and system overview
  • Equipment and rack identification
  • Cable, outlet, and pathway labels
  • Testing and commissioning records by scope
  • Field conditions and approved exceptions
  • Configuration and organization references
  • Authorized-user orientation
  • Maintenance, support, and expansion notes

Handoff content follows the contracted scope and available project information; not every project requires the same documents or testing.

Developers & New Construction FAQs

When should ALTRIOM TECH join the project?

Ideally during concept, design development, or before electrical and low-voltage pathways are finalized. We can also review projects already in construction and identify practical next steps based on current conditions.

Can you provide only planning and prewire?

Yes. The engagement can focus on technology planning, infrastructure delivery, or continue through complete equipment installation, configuration, testing, documentation, and support planning.

Can you coordinate with our architect and general contractor?

Yes. Coordination may include architecture, interiors, electrical, mechanical, millwork, ceilings, doors, gates, landscape, pools, security, communications, and other specialty trades.

Can one technology standard be reused across multiple units or phases?

Yes. A project standard can define pathways, unit provisions, equipment categories, locations, labels, testing, configurations, handoff requirements, and approved exceptions for different unit types or phases.

How are field changes handled?

Field conditions and requested changes should be reviewed for impact on scope, infrastructure, compatibility, schedule, access, finishes, equipment, testing, and documentation before implementation.

What determines the final scope?

Property type, project stage, plans, schedule, construction methods, systems, unit count, amenities, infrastructure, trade responsibilities, equipment expectations, integration compatibility, testing, documentation, and future phases influence the final scope.

PLAN BEFORE PROBLEMS BECOME EXPENSIVE

Bring Technology into the Project Early.

Share the project type, location, current stage, schedule, plans, unit count, intended systems, and coordination priorities. ALTRIOM TECH will help define the appropriate involvement.